2018, 4.5 hours

Full depth reclamation (FDR) is a rehabilitation technique in which the full thickness of the asphalt pavement and a predetermined portion of the underlying materials (the base, subbase, and/or subgrade) is uniformly pulverized and blended to provide an upgraded, homogeneous material. This course will start with the basics of FDR and then move through pre-production and reclaiming to post-production activities.

Register Here